Playing Dr. Frankenstein: DoD Memo Tries to Revive Joint Venture Facility Clearance Requirements

Back in 2021, GAO came down with a clear decision on whether Department of Defense (DoD) agencies could require a joint venture (JV) to have its own facility clearance level (FCL) if its component members held the required FCL themselves. Infopoint LLC, B-419856 (Aug. 27, 2021). That decision was “no,” and it was based on a very strong foundation: The 2020 National Defense Authorization Act (2020 NDAA), an act of Congress, contained a provision, Section 1629, expressly forbidding DoD agencies from doing such. We in fact did a blog post on this GAO decision and litigated this very matter. Despite this, in October 2023, the DoD quietly released a memorandum describing how they think they can still require JVs to have their own FCL. Today, we look at this memorandum to see what DoD is saying.

Continue reading

GAO Affirms SBA Rule: Only Joint Venture Members, not the JV, Need Facility Clearance

For years, it had been difficult for joint ventures to get Facility Security Clearances to go after DoD contracts where a facility clearance was required. The DoD and many contracting officers had long required that the joint venture entity itself, rather than each individual joint venture member, have the FCL. SBA thought it had fixed this problem when it updated its joint venture rules in November 2020 to eliminate the need for the joint venture to have an FCL, as we wrote at that time. But DoD contracting officers had been ignoring this rule, setting up a showdown at GAO to decide if the SBA’s rule did actually apply to the DoD.

Continue reading