Undisclosed Agency File Size Limit Sinks Offeror’s Proposal

An offeror’s proposal was properly rejected as late because the proposal exceeded the agency’s email file size limit.

In a recent bid protest decision highlighting the importance of not submitting electronic proposals at the last minute, the GAO held that a small business’s proposal was late because the emails transmitting the proposal exceeded 10 MB–even though the solicitation didn’t mention a file size limit.

Continue reading

Agency Spam Filter Excludes Proposal; Offeror Loses Protest

An agency’s spam filter prevented an offeror’s proposal from reaching the Contracting Officer in time to be considered for award–and the GAO denied the offeror’s protest of its exclusion.

A recent GAO bid protest decision demonstrates the importance of confirming that a procuring agency has received an electronically submitted proposal because even if the proposal is blocked by the agency’s own spam filter, the agency might not be required to consider it.

Continue reading

GAO: Initial Proposal “Nullified” By Solicitation Amendment

When an initial proposal is nullified by a subsequent solicitation amendment, an offeror must timely resubmit its proposal–or be eliminated from the competition.

As one offeror recently learned, an agency can nullify initial proposals with a solicitation amendment that substantially changes the solicitaton’s terms.  When that happens, an offeror can no longer rely on its initial proposal.

Continue reading

Reverse Auctions: Last-Second Bid Was “Late”

In a reverse auction, a bid filed literally at the last second was excluded as late, perhaps because the reverse auction system did not process the bid until a few seconds after the deadline.

As a recent GAO protest demonstrates, reverse auctions–by their very nature–encourage last-second bids, but it is the prospective contractor that may pay the price if the reverse auction system does not immediately process a bid.

Continue reading

Offeror’s Email Proposal “Bounces Back,” Agency Not To Blame

A procuring agency was not at fault when an offeror’s emailed proposal “bounced back” because of the large size of the email.

In a recent decision, the GAO applied the general rule that it is “an offeror’s responsibility to deliver its proposal to the proper place at the proper time” and held that the agency was not to blame when its email server rejected the large email containing the offeror’s proposal.

Continue reading

Proposal In Government Mailroom Was Still “Late”

Even if a proposal arrives in a government mailroom by the submittal deadline, the proposal is nevertheless “late” if it does not reach the location specified in the solicitation by the designated time.

In a recent bid protest decision, the GAO reaffirmed long-standing precedent that “receipt of a bid or proposal at a mailroom or other receiving area does not constitute receipt at the location specified in the RFP, provided the agency has established reasonable procedures to ensure that mailed bids or proposals are routed from the mailroom to the location designated in a solicitation for receipt.”

Continue reading

Extreme Weather Didn’t Excuse Late Proposal

With winter weather descending on much of the country, it is all the more important for contractors to ensure that their proposals are submitted with time to spare.

In a recent bid protest decision, the Court of Federal Claims held that extreme weather at an offeror’s location did not excuse the offeror’s failure to deliver a timely proposal because there was no interruption of “normal government processes” at the government location designated to receive proposals.

Continue reading